Thursday, 19 November 2026

Cable Tray Cost per Meter: Six Levers That Cut Scrap

Where the Money Actually Goes

A cable tray quote is six lines, not one number. For a 300 by 100 mm perforated trough in 1.5 mm pre galvanized steel on a 585 mm strip, material takes 65 to 75 percent of the total. Labour takes 8 to 12 percent, energy 3 to 5 percent, die amortisation 3 to 6 percent, maintenance 2 to 4 percent, and scrap credit subtracts 2 to 5 percent. Add the middle of each band and production cost lands near 7.10 USD per meter. Two plants with the same machine, steel and wage bill can still sit 0.80 USD apart.

The Lever Nobody Likes

Coil yield is the biggest item and the least discussed. Width is set from the developed section plus a margin of 8 to 15 mm. Every millimetre above that margin is bought, slit, shipped and trimmed off again. On a 585 mm strip, 15 mm of fat is 2.6 percent of the coil. At 300,000 meters a year, that is roughly 60,000 USD with nothing to show for it. Put the margin in writing per tooling set, hold the slitter to plus or minus 0.5 mm, and measure incoming coils as blades wear.

Three Bins Instead of One

Scrap is not one material. Clean edge trim from pre galvanized coil sells at 280 to 340 USD per tonne. Oiled punch slugs bring 230 to 290. Mixed shop scrap bottoms out at 180 to 240. Tipping all three into one bin gives away 60 to 90 USD per tonne. On a line running 1,200 tonnes a year, moving a third of the scrap to a clean grade is worth 8,000 to 15,000 USD. A higher scrap price never beats not making the scrap, so prevention stays first.

Speed, Changeovers and Air

At 12 m per minute a 480 minute shift makes 5,760 meters. At 18 m per minute it makes 8,640, with the same crew cost, so labour per meter drops by a third. Run past the point where the punch misses and rejects erase the gain. Plan batches by width, since three changeovers can cost 1.2 to 2.0 percent of the coil in setup scrap. Inspect the punch tip every 20,000 hits. A 6 mm air leak at 7 bar burns about 1,000 USD a year. Work all six levers and the return is about 0.29 USD per meter, or 87,000 USD at 300,000 meters.

Read the full article →

6 Changeover Checks That Separate Z Purlin Lines

Stopwatch, Not Brochure Buyers of a Z purlin roll forming machine are often shown the same numbers: 1.5 to 3.5 mm galvanized strip, webs fr...